Just to updat you on the track layout as it has changed due to operational duties and also manuel handleing for when operating with more than two train sets or more running at the same time.
HI David My printer is a Wanhao Duplicator 9 300-300, Using Lightwave 11.5 for my modeling and Wanhao Cura for the slicing. I have still have got 3 boards to do with two Ribblehaed Viaduct and the last board will consist of Ribblehaed Station with Quarry. :D All 3d parts are drawn then to scale down...
HI Guys and Girls.
Well still on with this manuth task and so I have just added some dark trees as I am now doing layout in sSmmer season than Autumn as I cannot been to find brownish things to make it look wild and ruggid.
Hi Tony Looking well for your first print Please check out all pics. Each square is 10meters so this will reduce to our scale to around 10mm in riduction ,just check as it has been sometime that I had to rework out scales. Tower 35mm high/ 40mm wide/ 10mm at bottom lenght Bridge lenght 130mm. Tube s...
HI Girls and Guys Just tokeep you upto date. I have now stripped off all straight set trackfor that I can now have the flexi track on as that works better for smooth running and also not as many sections to join which can be the weak spot in set track. Please see pics below ps most before I stripped...
HI Yes all Track is set track till the two middle boards of when it flys over the viaduct as a dingle track Post 1980's , so that I can run one train in either direction on same track which will get the folks confuesed, but really I am just extending the Auto Track from T-Gauge in order to do so. Ju...
HI T-gauge people Hope you are all well and safe Update on Ribblehead layout. Board 4 is now lloking a bit better as now I have placed some track down and then re worked the fiddle loop sections better, but now needing more points (boohoo. Track and wiring along for board 4 is coming around the £600...
just need the kasons printing off and placing around the buttresses and another re paint for where the track is going to be as my bacl dribbled on it when painting the main bridge structure.
HI girls and guys.
Been modelling the cliffs and now painted first coats on them.
Aslo just done the sea water( still drying so cannot place bridge on yet).
HI People Just to let you know whilst being playing with my 3D printer I have printed off a couple of the track and ballast replacement trains from Network Rail in yellow. :D See pics to see more and let me know what you think so that I can do better. :) ps oil tanker from T-gauge helps with scale s...